  • We have supplied 3 air handling units (83.3TR) for a government client in Oman. The units were supplied in semi-knocked down condition from factory due to site constraint. The scope of works included ahu assembly, chilled water piping and insulation,...

  • We have supplied one air handling unit (20 TR) in complete knocked-down condition (from factory) along with DDC panel for a 5 star hotel project in Muscat. The AHU was successfully assembled and commissioned by our team at site.

  • We designed and executed chilled water plant for a process cooling requirement. Our integrated solution included supply, installation, testing and commissioning of one duty and one duty-assist chiller mounted on common skid with storage tank, primary...

  • We have done replacement of Chiller Plant with a capacity of 800 TR for ministry client in Oman. Project includes 4 Chillers, 5 Pumps & other associated equipments, with necessary piping & valve package replacement. the scope was carried out within m...

  • We designed and executed chilled water system for multiple renal dialysis unit across Sultanate of Oman. A total of 4 chiller plant (152 TR), which includes - chiller, primary pumps, storage tanks, plate heat exchanger, secondary pumps and controller...

  • We have done the supply, installation, testing and commissioning of air conditioning system for a RO plant in Ghubra. The electrical plant room is cooled by 3 nos. 30TR Rooftop packaged unit.

  • We have supplied 53 AHUs, 2 FAHUs, 4 BCUs from UNTES Turkey, All units, except FAUS, are ceiling suspended type with special base frame arrangement. For this project 80 FCUs were supplied from Aermec Italy. Total installed low side capacity is 516 ...

  • 3 nos. 590 kW air-to-water heat pump has been supplied to a 5 star resort in Ras Al Hadd, Oman. These heat pumps shall be provide cooling/heating of 5 swimming pools, including a 100m long pool, the longest one in any hotel-resort in the Country.

  • Our specialist team executed supply, installation, testing and commissioning of 119 nos. ducted split, 120 nos. floor standing unit and 15 nos. rooftop package unit with a total installed capacity of 1461 TR to provide wild air cooling for a 2B+G+64 ...

  • We have done installation & commissioning of 900 TR HVAC System for a major client. The project had 3 Chillers, 8 Pumps, 20 AHUs, 98 FCUs & other associated equipments.